找回密碼
 會員申請加入
搜索

東鐵綫月台影像分析系統安裝工程

[複製鏈接]
marcowong1011 發表於 2021-6-15 19:50 | 顯示全部樓層 |閱讀模式

                                    Advertisement




MTR Corporation Limited invites qualified contractors to express their interest in tendering for the provision of Video Analytic (VA) for Closed-Circuit Television (CCTV) system at East Rail Line (EAL) strategic platforms for facilitating effective monitoring of platform situations.

The contractor shall supply and install the following (but not limited to):

1. Servers with VA software
2. Network switches
3. Workstations with Alarm Management Software
4. Visual and audio indicators
5. Cabinets
6. Power, data cables and accessories.

CCTV VA system shall be installed at all EAL platforms except Hung Hom Station. The system shall interface with existing IP-based CCTV system for obtaining video streams of selected cameras at platforms. The video streams shall be fed to servers for VA at Telecom Equipment Room and detection of major scenarios such as passenger climbing over Automatic Platform Gates or lining up beyond yellow line.


http://www.mtr.com.hk/en/corporate/tenders/K3291-21E.html

標題刪除蝗語

比之前輕鐵黃綫個系統更多功能
HV9990 發表於 2021-6-17 21:23 | 顯示全部樓層
我相信都係人面辨識好叻嗰間公司中多
KCRC . Keep Moving
您需要登錄後才可以回帖 登錄 | 會員申請加入

本版積分規則

Advertisement

Advertisement

Advertisement

Advertisement

Advertisement

站規|清理本站Cookies|手機版|hkitalk.net 香港交通資訊網

GMT+8, 2025-12-19 07:06

Powered by Discuz! X3.5

© 2001-2025 Discuz! Team.

快速回復 返回頂部 返回列表